Richmond.gov.uk
My Account

Waste and recycling collections

Each collection is made by a separate vehicle. Vehicles come at different times during the day.

Your collections:

Glass, can and plastic recycling

  • Monday 4 August 2025

Paper, card and carton recycling

  • Monday 4 August 2025

Rubbish and food

  • Monday 4 August 2025

Garden waste

  • No collection contract at this address
    Sack collections can be booked for Monday 4 August 2025

Parking

Not in a Controlled Parking Zone (CPZ)

This property is not eligible for Parking permits.

Ward councillors

Electoral Ward

Barnes Ward

Most recent local election results

Thursday, 5 May 2022

Polling station

Holy Trinity Church Hall
Trinity Church Road, Barnes, London, SW13 9ET

Local MP

Sarah Olney (Liberal Democrat Party)

Constituency: Richmond Park

Most recent election results

Thursday, 4 July 2024

Polling station: Holy Trinity Church Hall
Trinity Church Road, Barnes, London, SW13 9ET

Conservation status

This property is in a conservation area:
CA25 Castelnau

Conservation area statement

View our online map to see all conservation areas across the borough.

Local planning applications

Most recently validated planning applications within 250m.

  • 24/T0048/TCA - 10 Merthyr Terrace Barnes London SW13 8DL
    T 1 Malus Front garden reduce back to most recent reduction points ongoing maintenence
  • 24/T0433/TPO - Land Rear Of 1 - 76 Riverview Gardens Barnes London
    T1 Norway Maple (Acer platanoides) Remove 4 low hanging limbs, back to main stem. Final height unchanged = 17m and final unchanged spread = 12m. T2 Ash (Fraxinus excelsior) Remove 3 low hanging limbs, back to source. Reduce large overhanging limb by 3m. Remove overhanging deadwood. Final height unchanged = 15m and final unchanged spread = 10m. T3 Ash (Fraxinus excelsior) Remove 3 low hanging limbs, back to source. Reduce large overhanging limb by 3m. Final height unchanged = 15m and final unchanged spread = 10m. T4 Whitebeam (Sorbus aria) Remove 4 low hanging limbs, back to source. Reduce remaining overhanging limbs by 1.5-2m. Final height unchanged = 10m and final unchanged spread = 18m. T5 Crack Willow (Salix fragilis) Remove 4 low hanging limbs, back to source. Final height unchanged = 10m and final unchanged spread = 8m. T6 Sycamore (Acer pseudoplatanus) Remove 1 low hanging limb, back to source. Final height unchanged = 17m and final unchanged spread = 12m. T7 Ash (Fraxi
  • PA25/1145 - Flat 50 William Hunt Mansions 4 Somerville Avenue Barnes London SW13 8HT
    Replace 12 damaged window panes .They are shot with a large amount of codensation.This is a like for like replacement and there will be nor work done to the frames.
  • PA25/1677 - 190 Castelnau, Barnes, London, SW13 9DH
    Part change of use of restaurant into 1bed self-contained flat, internal alteration, addition of windows, create open-air internal court-yard, addition of skylights, increase floor level and roof height, demolish part of the rear extension to make room for entrance gate and steps to the entrance, part change of roof profile from pitch to flat roof

View more applications | Sign up for email alerts

Building control history

Applications made for this address.

  • 97/1438/3/FP

    Conversion to form 24 flats, leisure complex and two storey car park (formerly known as 'Soap Factory') (Charles Harrod Court)

  • 97/1438/1/FP

    Construction of 38 three & four storey town houses (Town House Square and Long Terrace)

  • 97/1438/2/FP

    Construction of 60 flats.(Blocks A, B, C and D only) (Courtyard and Garden Square)

  • 20/0240/IN

    Create open plan layout for kitchen and living room by removing partition wall, update electrics installation and installation of new fuse box, install air conditioning and new kitchen installation

  • 22/1684/BN

    Removal of non-loadbearing wall between reception room and kitchen and new double fire door to reception and entrance hall wall.

  • 10/0424/IN

    Internal alterations

  • 97/1438/FP

    Residential development of flats & houses comprising 250 units

  • 20/1716/IN

    Alterations and refurbishment to flat. Excluding any works carried out in accordance with the self-certified scheme. As defined in schedule 3 (competent person scheme) Building Regulation 2010 as amended. Excluding any works carried out under the Gas Safety (installation and use) Regulations 1998

  • 97/1438/4/FP

    Conversion to form 37 flats (formerly known as 'Candle Factory') (Richard Burbidge Mansion)

  • 21/1152/IN

    Removal of partition walls to form open kitchen/dining room, installation of new bathrooms/kitchen, new heating & electrical systems, installation of air conditioning and installation of charging point in basement car park

  • 24/1333/RG

    Block up door to kitchen and open kitchen in to lounge

  • 97/1438/5/FP

    Construction of 24 flats to be known as 1-24,Wrenn House,2, Brasenose Drive, Kew. SW13 8NN

Local map