Richmond.gov.uk
My Account

Waste and recycling

Collection day: Friday

Next fortnightly green waste collection: 09 May 2025

View calendar

Parking

Controlled Parking Zone (CPZ): T2 - Teddington

Times: Monday to Friday 10am to noon (Bank and Public Holidays free)

This property is eligible for Parking permits.

Ward councillors

Electoral Ward

Teddington Ward

Most recent local election results

Thursday, 5 May 2022

Polling station

Elleray Hall
Elleray Road, Teddington, Middlesex, TW11 0HG

Local MP

Munira Wilson (Liberal Democrat Party)

Constituency: Twickenham

Most recent election results

Thursday, 4 July 2024

Polling station: Elleray Hall
Elleray Road, Teddington, Middlesex, TW11 0HG

Conservation status

This property is not in a conservation area, but if you want to see other conservation areas across the borough view our online map.

Local planning applications

Most recently validated planning applications within 250m.

  • Elleray Hall Site North Lane Depot And East Car Park Middle Lane Teddington

    Details pursuant to conditions U0130634 - Condition NS82: Sale of the land, and U0130638 - NS86 Arrangements prior to construction (part b only), of planning permission 21/2533/FUL.

  • Elleray Hall Site North Lane Depot And East Car Park Middle Lane Teddington

    Details pursuant to condition U0130555 - NS05: Mechanical Services Noise Control, U0130556 - NS06: External Illumination, U0130572 - NS23: PV Panels (Community Centre), U0130583 - NS34: Landscaping (Comm Centre), U0130586 - NS37: Tree Planting (Community Centre), U0130587 - NS38: Urban Greening Factor (comm centre), and U0130596 - NS47: Cycle parking, of planning permission 21/2533/FUL.

  • National Physical Laboratory Hampton Road Teddington TW11 0LW

    Removal of modern slate and timber lean-to roof inside courtyard, external repairs & localised rebuilding of failed brickwork to boundary/courtyard wall adjoining Bushy House, retention of 2No existing tree stumps and planting of replacement London Plane tree. In association with planning application 24/1500/FUL.

  • Elleray Hall Site, North Lane Depot and East Car Park

    Non-material amendment to 21/2533/FUL to increase the number of PV panels to the roof top and two southern roof planes of Elleray Hall Community Centre.

  • 34 Queens Road Teddington TW11 0LR

    Non material amendment to planning approval 23/3439/HOT - Construction of part single/two storey rear extension. (Non-material amendment for Revision of parapet to ground floor. Revision to rear ground floor doors, roof lights and to position of first floor window.)

View more applications | Sign up for email alerts

Building control history

Applications made for this address.

  • 18/2042/IN

    Fit out and internal alterations to laboratories L5 and L15-18

  • 23/1451/IN

    The refurbishment of laboratory spaces F6 L23, 24 & 25

  • 18/0358/IN

    Window replacement works

  • 03/0144/BN

    Addition of shower to existing cloakroom.

  • 24/0920/IN

    The refurbishment of existing laboratory space in F9 L16 and L17

  • 20/1338/IN

    The refurbishment of the Photonics Laboratory (rooms F5 L9, F5 L10, F4 L8 and L9 and F4 L10) in Module 4 and Module 5

  • 02/0040/AI

    Internal refurbishment of existing offices & laboratory (building 47)

  • 06/1262/IN

    Internal refurbishment and alterations

  • 06/1455/IN

    New single storey building to provide a clinical linear accelerator between existing building 54 and Module 6

  • 18/0039/IN

    Internal alterations and refurbishments to Modules 1-16, Pods A-G and Buildings 1, 3, 14, 19, 27, 38, 41, 42, 47, 51, 53, 54, 55, 67, 68, 70, 80 and 84

  • 03/0861/1/FP

    New IT hub room with mezzanine floor, extended landing and lifting beam.

  • 23/1755/IN

    Lab refurbishment to multiple spaces on Level 2 and 3

  • 21/1695/IN

    Refurbishment of F1 L1 Laboratory

  • 22/1555/IN

    Refurbishment of the Orbital Radiance Lab (ORM) Lab F5 L17

  • 05/2002/IN

    Internal refurbishment of Module 12 computer room at first floor, Module 12 rooms F12.CS1-4

  • 23/1448/IN

    L26 Lab refurbishment

  • 06/1259/IN

    Internal refurbishment and alterations

  • 03/1946/RS1/FP

    New manganese bath suite incorporating new delivery reception and counting room.

  • 20/1253/IN

    Removal and replacement of security doors, installation of security grilles at various locations and installation of bollards to building 47, installation of security doorsets to building 53 and 6

  • 23/0562/IN

    Alterations to the existing security room, to form new control room

  • 20/1468/IN

    Internal alterations to create additional WC

  • 23/1792/IN

    Internal refurbishments and alterations to the existing laboratory/office building at ground and 1st floor level known as module 14 for additional teaching/offices and associated uses

  • 03/1946/FP

    New manganese bath suite incorporating new delivery reception and counting room.

  • 20/1047/IN

    Provision of antenna platform to Modul 4

  • 23/0060/IN

    Gantry and staircase with handrails including: steelwork connections; walkways; handrails; metal access stair

  • 13/1739/FP

    Recladding envelope of an industrial building, removal of portacabin offices, the construction of steel framed offices in thier place

  • 24/1319/IN

    Refurbishment of Lab F2 L13

  • 06/1260/IN

    Internal refurbishment and alterations

  • 99/0736/1/FP

    Redevelopment for laboratories and offices.

  • 21/0070/IN

    Refurbishment of the F8 L5 laboratory located within Module 8

  • 20/1626/IN

    Strip out and refurbishment of ground and first floor office/staff accommodation

  • 22/0327/IN

    Alterations to the existing part first floor offices and formation of three new cellular offices. Replacement of all windows throughout the unit

  • 23/1708/IN

    New spiral stair to access roof AQML Building

  • 24/0247/IN

    Refurbishment of existing lab space into a clean room

  • 19/0195/IN

    Structural alterations to the roofs of modules 1 and 2 to form access to and erection of antenna

  • 22/1872/IN

    Full refurbishment and fit-out of ground floor office and welfare facilities

  • 23/1452/IN

    Building 240: The removal of an existing temporary building with a steel platform above and replacement with a new temporary building with a new steel platform and steel staircase

  • 24/1539/IN

    Refurbishment of Lab G8 L4

  • 14/2631/IN

    Refurbishment of Building 2 to create laboratories and office space, new build extension to rear of building 2 to create single storey laboratories and atrium space plus part refurbishment of Building 1 to create plant space and external plant areas

  • 19/1496/IN

    The refurbishment of rooms F5-L12 to L14, L16, and L21 to L26 within the Module 5 Building

  • 24/0654/IN

    F9 L8 Battery Cycler Modifications

  • 24/1214/IN

    Structural alterations to Pod G to form a compressor house

  • 23/0233/IN

    Installing new access card readers to over 80 door sets within the National Physical Laboratory Campus

  • 10/1551/IN

    6 No. New residental and 2 No. Conversions (now known as Apartments 1 to 8 Elm Lodge, Queens Road, Teddington TW11 0DA)

  • 24/1390/IN

    Installation of radiation lab doors

  • 22/1873/IN

    Full strip out and refurbishment of existing auditorium space on the first floor

  • 20/1340/IN

    Refurbishment and fit out of existing Cafe Area within Modual 15 first floor area

  • 20/1065/IN

    Internal refurbishment of the existing F9 L14 laboratory, Module 9

  • 98/1119/AI

    89 No. New dwellings (Now known as 1-89 Admiralty Way, Teddington)

  • 03/0861/FP

    New IT hub room with mezzanine floor, extended landing and lifting beam.

  • 22/1876/IN

    Refurbishment of existing toilet and nappy changing facilities including upgrades to M&E systems. Replacement windows and doors to the whole building and new perimeter gates will be supplied with access control.

  • 18/0171/IN

    Extension, alterations and refurbishment of Pod G Area

  • 21/1645/IN

    Refurbishment of Laboratory

  • 24/0543/IN

    HVCA replacement works, G3-L22 Module 3

  • 21/1917/IN

    Replacement of air handling units, installation of PV panels, refurbishment of basement, refurbishment of stair core A and fire safety remedial works

  • 99/0736/2/FP

    Redevelopment for laboratories and offices.

  • 06/1258/IN

    Internal refurbishment and alterations

  • 19/1495/IN

    The refurbishment of rooms G10-L4, G10-L12a, G10-L12, G10-L13, G10-L14a & G10-L14b within the Module 10 Building

  • 99/0736/FP

    Redevelopment for laboratories and offices.

  • 98/0657/FP

    Office/laboratory

  • 24/0653/IN

    The refurbishment of existing laboratory space in F9 L15

  • 24/1117/IN

    Internal alterations and refurbishments to Modules 1-16, Pods A-G and buildings 1,3,14,19,27,38,41,42,47,51,53,54,55,67,68,70,80 and 84

  • 24/1215/IN

    Structural alterations to the roofs of modules 1 & 2 to form access to and erection of antenna

  • 99/0736/3/FP

    Redevelopment for laboratories and offices.

  • 12/0473/IN

    Conversion into 2 dwellings and extension to create 6 new dwellings.

  • 92/0090/BN

    (British Maritime Technology Building No. 70, Wind Tunnel No. 6) Internal structural modifications to existing structure and installation of new rolling road

  • 22/1874/IN

    Main Building - Demolition of existing internal office partitions, welfare, and toilet facilities to create new office, kitchenette, and toilet facilities. Re-configuration of existing warehouse space including works to M&E systems.

  • 19/1990/IN

    Refurbishment of three lab areas (G23, G29 and first floor over G23)

  • 06/1261/IN

    Internal refurbishment and alterations

  • 18/2041/IN

    Structural alterations to Pod G to form a compressor house

  • 21/0188/IN

    Replacement of the existing windows and external doors in B2/Darwin Building

Local map