Construction is currently taking place on a flood alleviation scheme at the junction of Waldegrave Road and Tower Road. This scheme will store water beneath the ground, reducing the amount of rainwater runoff from up to four different roads that would otherwise overwhelm the sewer network at this location.

Road closure

The road will be closed from the junction with Tower Road to the pedestrian refuge in Waldegrave Road from 28 October to 3 November.

Vehicle access for residents will be maintained and managed throughout the closure.